![]() ![]() ![]() Period plus 3S (three times the standard deviation) is 303 days + 14.13 = 317.13 days, then it is Whereas if the duration / Project Completion On time / period of 303 days (normal time) only by 50%. The target analyte project completion time T (d), shows that the possibility of the project is completed Review Technique (PERT) Method and Presedence Diagram Method (PDM) with a software programĬompletion time planning the optimal project using PERT and PDM is 303 days with a The building project B FIA UB used a method, and the method used herein is Project Evaluation and To improve the quality of planning and control of With the number of activities that tend to increase. ![]() Project managers always want to find a method which can improve quality and control to deal MANAJEMEN WAKTU, BIAYA DAN SDM PROYEK KONSTRUKSIġ,2Jurusan Teknik Sipil Fakultas Teknik Universitas Muhammadiyah MalangĪlamat korespondensi : Jalan Raya Tlogomas 246 Malang 65144 ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |